- Hartleigh Avenue is closed at Richmond Road until Friday, May 28.
- Woodroffe Avenue southbound will be reduced to one lane between Iris Street and Baseline Road nightly from 6 pm to 11 pm on Thursday, April 29 and Friday, April 30.
- Highway 417 – The following ramps will close from 11 pm on Tuesday, May 4to 5 am on Wednesday, May 5 for Stage 2 LRT roadwork:
- Westbound on-ramp from southbound Moodie Drive
- Westbound on-ramp from northbound Holly Acres Road
- Westbound on-ramp from southbound Pinecrest Drive
- Highway 417 – The following lane reductions and ramp closures will take place from 8 pm on Friday, April 30 to 6 am on Monday, May 3 for bridge repair work:
- Highway 417 eastbound, between Carling Avenue and Rochester Street, will be reduced daily to one lane between 8 pm and 10 am and to two lanes between 10 am and 8 pm.
- The eastbound Rochester Street off-ramp and the eastbound Parkdale Avenue on-ramp will close.
- Atlantis Avenue will close from Monday, May 3 to Wednesday, June 30 for Stage 2 LRT work. Local access will be maintained.
- Highway 174 – The following Highway 174 ramps and lanes will close for Stage 2 LRT roadwork:
- The eastbound Highway 174 lanes at Jeanne d’Arc Boulevard will close from 9 pm on Friday, April 30 to 5:30 am on Monday, May 3. Vehicles will be detoured to the Jeanne d’Arc Boulevard on and off-ramps to cross.
- The eastbound on-ramp from Blair Road will close nightly from 9 pm to 5:30 am from Monday, May 3 to Friday, May 7 and again from Monday, May 10 to Friday, May 14.
- The eastbound on-ramp from Montreal Road will close nightly between 9 pm and 5:30 am from Monday, May 3 to Friday, May 7 and again from Monday, May 10 to Friday, May 14.
- The eastbound off-ramp to Place d’Orléans Drive will close nightly from 9 pm to 5:30 am until Thursday, May 6.
- The eastbound on-ramp from Place d’Orléans Drive will close nightly from 9 pm to 5:30 am until Thursday, May 6.
- The westbound off-ramp at Champlain Street will close nightly from 9 pm to 5:30 am until Thursday, May 6.
- The westbound on-ramp from southbound Tenth Line Road will close nightly from 9 pm to 5:30 am until Sunday, May 9.
- The westbound on-ramp from southbound Champlain Street will close nightly from 9 pm to 5:30 am until Thursday, May 6.
- The westbound on-ramp from northbound Champlain Street will close nightly from 9 pm to 5:30 am until Monday, May 3.
- The westbound on-ramp from northbound Tenth Line Road will close nightly from 9 pm to 5:30 am from Monday, May 3 to Friday, May 7.
- The eastbound Highway 174 lanes at Champlain Street will close from 9 pm on Friday, May 7 to 5:30 am on Sunday, May 9. Vehicles will be detoured to the Place d’Orléans Drive off and on-ramps to cross.
- Montreal Road is reduced to one lane of traffic in each direction under the Highway 174 overpass until mid-July 2021 for Stage 2 LRT work.
- Dairy Drive is closed until Friday, June 4 for Stage 2 LRT work.
- Limebank Road south of Earl Armstrong Road, will be reduced to one lane of traffic in each direction from 7 am on Monday, May 3 to 3 pm on Wednesday, May 5, and again from 4 am to 3 pm on Friday, May 7 for Stage 2 LRT work. Limebank Road will close completely between Earl Armstrong Road and Rideau Road from 8 pm on Monday, May 10 to 5 am on Tuesday, May 11.
For updates on construction and roadwork activity across Ottawa, or for information about traffic and travel planning, visit the City’s traffic map or follow the City’s traffic account on Twitter.