Woodroffe Avenue will close at Richmond Road from 6:30 pm on Friday, May 28 to 5:30 am on Thursday, June 10 for Stage 2 LRT work. Signed detours will be in place.
Byron Avenue will close between Allison and Woodland avenues from Monday, May 31 to Friday, June 4 for Stage 2 LRT work. Local access will be maintained.
- Highway 417 – The following ramps will close overnight, if weather permits:
- The westbound on-ramp from southbound Pinecrest Road will close from 11 pm on Friday, May 28 to 5 am on Saturday, May 29.
- The eastbound St. Laurent Boulevard on-ramp will close from 10 pm on Thursday, May 27 to 5:30 am on Friday, May 28.
- The eastbound Nicholas Street and Lees Avenue off-ramps will close from 10 pm on Thursday, May 27 to 1 am on Friday, May 28.
- The westbound Nicholas Street off-ramp will close from 1 am to 2 am on Friday, May 28.
- The eastbound Nicholas Street on-ramp will close from 2 am to 5:30 am on Friday, May 28.
- The westbound Greenfield Avenue and Nicholas Street on-ramps will close from 10 pm on Friday, May 28 to 5:30 am on Saturday, May 29.
- Highway 417 – The following lane reductions and ramp closures will take place from 8 pm on Friday, May 28 to 6 am on Monday, May 31 for bridge repair work, if weather permits:
- Highway 417 eastbound, between Carling Avenue and Rochester Street, will be reduced to one lane daily between 8 pm and 10 am and to two lanes between 10 am and 8 pm.
- The eastbound Rochester Street off-ramp and the eastbound Parkdale Avenue on-ramp will close.
Atlantis Avenue will closebetween Lanark and Selby avenues from Monday, May 31 to Saturday, July 31 for Stage 2 LRT work. Local access will be maintained.
McLean Crescent will closebetween Cecil Rowat Lane and Bravar Drive from Monday, May 31 to mid-July for watermain work. Signed detours will be in place. Cyclist, pedestrian and local access will be maintained.
- Highway 174 – The following ramps and lanes will close for Stage 2 LRT roadwork:
- The westbound on-ramp from southbound Tenth Line Road is closed until 5:30 am on Monday, June 7.
- The westbound Champlain Street off-ramp will close from 5:30 am on Monday, May 31 to 5:30 am on Monday, June 7.
- The westbound on-ramp from northbound Tenth Line Road will close nightly from 9 pm to 5:30 am from Monday, May 31 to Sunday, June 6.
- The eastbound Blair Road off-ramp will close nightly between 9 pm and 5:30 am from Monday, May 31 to Sunday, June 6.
- The westbound on-ramp from southbound Champlain Street will close nightly between 9 pm and 5:30 am from Monday, May 31 to Sunday, June 6.
- The westbound on-ramp from northbound Jeanne d’Arc Boulevard will close from 9 pm on Wednesday, June 2 to 5:30 am on Friday, June 4.
- The eastbound lanes at Jeanne d’Arc Boulevard will fully close from 9 pm on Friday, June 4 to 5:30 am on Monday, June 7. Vehicles will be detoured via the off and on ramps.
- Highway 174 westbound will be reduced to one lane between Orléans Boulevard and Jeanne d’Arc Boulevard from 9 pm on Wednesday June 2 to 5:30 am on Friday, June 4.
- Highway 174 westbound will be reduced to one lane between Jeanne d’Arc Boulevard and Sir George-Étienne Cartier Parkway from 9 pm on Wednesday June 2 to 5:30 am on Friday, June 4.
- The westbound on-ramp from northbound Jeanne d’Arc Boulevard will close from 9 pm on Wednesday June 2 to 5:30 am on Friday, June 4.
Huntmar Drive, from Maple Grove Road to Palladium Drive, will close from 6 pm on Friday, May 28 to 6 am on Monday, May 31 for sewer installation.