Oct22020 Shown below is a map to help demonstrate the new alignment and connections with the new pedestrian bridge. Note: this illustration is a draft Categories: LRT Stage 2, Queensway Terrace North, WhitehavenOctober 2, 2020 Share this post Share on FacebookShare on Facebook TweetShare on Twitter Pin itShare on Pinterest Share on LinkedInShare on LinkedIn Post navigationPreviousPrevious post:Ottawa’s Water is excellent – Reduce use of Water bottlesNextNext post:Stage 2: Edgeworth utility work is postponed to 2021Related postsStage 2 LRT Ward UpdateJune 9, 2022Stage 2 work: Ambleside Detour going into effect June 13June 9, 2022Multi-Use Pathway (MUP) ClosureJune 9, 2022Bay Ward Community Garage Sales Saturday June 4thJune 3, 2022Woodroffe Pedestrian Bridge DetourMay 27, 2022Hydro Ottawa undertaking work to improve the electrical systemMay 21, 2022