The Transitway will permanently close between Pinecrest and Bayshore Stations for construction of the Stage 2 O-Train extension to Moodie Station. Bayshore and Pinecrest Stations will remain open with adjustments to some stops and platforms.
Westbound, all bus routes will be detoured to travel along Highway 417 from Pinecrest Road to Bayshore Drive. Routes that currently serve Pinecrest and Bayshore Stations will continue to serve those stations.
When the Highway 417 westbound off-ramp at Pinecrest re-opens on May 8, westbound Routes 63, 64, 66, 67, 406, 454 and westbound Connexion routes will serve Pinecrest Station.
Eastbound, routes will be detoured to follow one of two patterns:
Routes 61, 62, 303, and 660 will maintain direct connections to Bayshore and Pinecrest Stations, travelling on Highway 417 between Holly Acres Road and Greenbank Road.
Routes 63, 64, 66, 67 and eastbound Connexion routes will bypass Pinecrest and Bayshore Stations and instead serve bus stops on Holly Acres Road and the eastbound Highway 417 on-ramp at Greenbank Road respectively.
At Bayshore Station, the Transitway platforms and pedestrian overpass to the mall will be closed for construction. Access to the mall will be made at street level through the parking garage next to the station. Signage will be posted to help direct customers.
To accommodate ongoing Stage 2 construction, Blair Station Bus Stop E will permanently close, and routes will be reassigned to serve nearby Stop D.
Version française page 2