Fencing in the north-east loop at the Pinecrest Interchange has been installed, as per the aerial view pictured above. KEV will review the site/site plan with their environmental team and then begin top soil removal and general excavation to prepare the lands for future construction.
At this time, there is no work happening further north (between the highway ramp and the Church).