When / Where
- Location #1 – 2625 Regina: 1 night of work on September 17, 2019 from 22:00 to 07:00
- Location #2 – 265 Poulin: 1 night of work on September 19, 2019 from 22:00 to 07:00
Rationale for exemption: The generator is required to carry the building load during the electrical shutdown. The electrical shutdown is required to disconnect existing panel and refeed to new panel for the installation of a new fire pump.